16.12.09

Exports up 18% in November


The good news just keeps rolling to reassure that the economic rebound is no flash in the pan, not withstanding soaring food prices. After 13 consecutive months of going downhill, India’s merchandise shipments have posted a growth of over 18% at $13.2 billion in November. The news comes weeks after the economy trumped market expectations by posting a near-8% year-on-year growth in the second quarter. Coinciding with the latest figures, commerce minister Anand Sharma told Rajya Sabha on Tuesday the government expected the position to improve in the coming months and exports would grow at 15% next year despite global recession. But it might still be a little early to pop the champagne and the government prefers to watch it for a while. “There is no great shift in demand, it (growth) is because of base effect,’’ commerce secretary Rahul Khullar told reporters. An indication of the reversal in downtrend came in October when exports dropped just 6.6% at $13.19 billion, the slowest pace of fall in the previous 10 months. Merchandise shipments had declined 39% in May as the economic crisis bit hard. Exports have been going downhill for the last 13 months since the economic crisis hit economies around the world. The pace of that fall has been showing signs of slowing in the last 2-3 months. Exporters, naturally, are happy but also getting worried over the government and the RBI withdrawing the incentives that were extended to them in the wake of the economic crisis hitting global markets. According to Federation of Indian Export Organisations (FIEO) president A Sakthivel, the turnaround is an “indication of exporters’ resilience and positive impact of the stimulus extended by the government’’.

Mumbai Metro One update



Mumbai will have to wait a little longer for the first ride on its metro rail. Phase one of the metro rail project, between Versova and Ghatkopar via Andheri, has run into its biggest roadblock even before its tracks are in place. The design of the alignments of its foundation pillars have been changed on J P Road, as the MMRDA failed to provide requisite road space for construction. It may be a similar story at five other stretches. Sources say the space crunch will not only increase the cost of civil construction by 40%, but also delay the project, which both MMRDA and MMOPL had promised to complete by the end of 2010.

8.12.09

Somewhere in Chennai....


The Cooum: With decades of sludge and sewage in its bed, it’s hard to imagine a sparkling river, with homes facing the waterfront, cafes and parks along the banks, shops lining the bridges, and ferries that will get people home quicker, bypassing clogged junctions. But that’s what deputy chief minister MK Stalin has set out to achieve. After announcing the formation of a Chennai River Authority to clean up the Cooum and other waterways, the state is set to embark on an ambitious ecological restoration project on Tuesday. It’s not too hard to find the river, even if you’re in an unfamiliar part of town. Its rank, dank odour precedes it and we follow an unpaved road into Gangai Amman Nagar. A family of pink and black pigs sleeps serenely on a bank of garbage, next to the carcass of a dead cousin. Sewage gushes out of a huge pipeline. The bed of the river is a jumble of plastic bags and discarded tyres; everything ultimately seems to find its way to the Cooum — plastic bowls, wires, slippers, mugs, bottles, clothing, a rusty tricycle. In the half-hour that we’re there, five tankers trundle down a makeshift bridge across the river and dump loads of raw sewage straight into the stream. A resident says it’s a regular affair. “The trucks come daily to dump waste from industries nearby. They don’t even wait to do it under the cover of darkness,” he adds. Further downstream, at Rail Nagar before Koyambedu, a group sifts through the rubble that a recent demolition drive has left. With the elevated expressway project taking off, encroachments on the banks are being removed. “Our colony will go next,” says Bharathi, who runs a tiny shop on the banks near Rail Nagar. Records available with the state public works department show that efforts to restore the waterway first began back in 1872 under the British. After Independence, chief minister C N Annadurai launched a ‘clean Cooum’ project at a cost of Rs 1.9 crore in the late 60s when M Karunanidhi was PWD minister. In 1973, when Karunanidhi was chief minister, he launched a boat service, the jetties of which still dot the riverfront. Crores have since gone down the Cooum drain with numerous panels, ministers and bureaucrats visiting the UK, US and Singapore to study rivers that have been cleaned up. “Plenty of money has been spent in the past decades on restoring the river but nothing has come of it. The issue is in selecting the right strategy,” says Suresh Babu, programme manager, Arghyam, a non-profit in the water sector. “Copying a western model will not work here. The primary difference between Singapore and Chennai is the density of population. We have five times the number of people as Singapore and we need to take their needs into account,” says Babu. The Cooum, primarily fed by discharge from tanks and water bodies, has seen a steady drop in freshwater over the years — another reason why it’s such a smelly sewer today. What really needs to be done is remove and reduce encroachments; restore water catchment areas around the city; stop sewage discharge and allow only treated water into the river. “If this is done, nature will take care of the rest,” says TK Ramkumar, an advocate with Exnora, who has studied the waterway for 20 years. Babu says there are 700-odd points where sewage flows straight into the river. According to one estimate, 93% of the pollution in the late-80s was caused by untreated sewage released into the river. “But to my knowledge not much has changed,” says Ramkumar. “The 1970s campaign to clean the river was a failure because government started dredging and de-sludging without stopping sewage inflows. De-sludging only caused more silt formation,” he says. Treatment of sewage is the key. “There can be no ‘beautification’ without revamping the sewerage system and ensuring that waste water is treated,” PT Krishnan of INTACH says. Treating sewage can also reduce the city’s water shortage if the endproduct is used by industries. “Metrowater says it treats 250 million litres a day (mld); industries need only about 150 mld. Desalinating seawater is three times more expensive than treating sewage,” says Ramkumar. But without accurate data on sewage inflows, it’s going to be hard to come up with the right strategy. “We don’t have data on waste water generated by the city,” says Babu. “Without that it’s unlikely that you can cut off the inflows. Government also needs to map catchment areas around the city and revive them so that the Cooum receives regular supply of freshwater.” Another issue is the many encroachments which have sprung up on the river’s banks as well as the bed. About 8,000 families live along the Cooum, and there are a number of shops, commercial buildings, complexes, and houses as well. “Encroachments should definitely be removed and new ones should not be allowed. Though it’s easy to blame the poor for the damage, studies have shown that less than one percent of the river’s pollution is caused by slums,” says Babu. Stalin to unveil project at Egmore .Deputy chief minister M K Stalin, who led a delegation to Singapore last month to study the transformation of the once-polluted Singapore river into a scenic waterway, will on Tuesday morning unveil the state government’s ambitious plan to clean up the Cooum on similar lines.According to official sources, Stalin will symbolically kick off the project by inspecting the river, which is one of the biggest eyesores of Chennai, at a spot in Egmore near the CMDA building. He will also hand over a stretch of land along the river to the Chennai Corporation which would develop it into a park. The stretch of land, running upto a kilometre, was recently cleared of encroachments and fenced to prevent encroachers from returning. The park, which will take up to five months to be built, will be in place only till the Cooum is cleaned up. “Once the river is cleaned up, the land will be open for commercial use,” the sources said. After inspecting the spot, Stalin will brief reporters about the project. Singapore took 10 years to clean up the Singapore river, which is 11 km long. Cooum, on the other hand, runs for 65 km, 18 km of which is in Chennai. The Cooum clean-up, if it works, could well be the next showpiece of the state government. River action plans in various parts of the country, including programmes to check the pollution in the Ganga and Yamuna have produced mixed results despite the magnitude of funding to back such schemes. Experts say the Cooum proposal stands a chance only if the government involves various municipal agencies right down to the panchayats in the areas surrounding Chennai city. The scheme may be part-funded by the World Bank and through the centre’s flagship infrastructure scheme, Jawaharlal Nehru National Urban Renewal Mission.

The river: The Cooum originates from near Kesavaram Anicut in neighbouring Tiruvallur district and flows through Chennai city before emptying into the Bay of Bengal.

Length of Cooum : 65 km (including 18km in the city)

According to studies, the river is 80% more polluted than treated sewage.

Fish could survive in the water for only 3 to 5 hours even after samples were diluted.

There are traces of heavy metals like copper and pesticides like endosulphan and lindane in it Cooum clean-up project: Cooum to be cleaned up on the lines of the once highly polluted and encroached-upon Singapore River, which was restored in 10 years A river authority headed by M K Stalin and comprising chief secretary and ministers and secretaries of slum clearance board and environment department to oversee the clean-up drive

Project cost : Rs 99 crore

No of families to be rehabilitated: 8,266

Somewhere in Haryana....


The second spell of Bhupinder Singh Hooda government in Haryana seems to be pushing the development of 13 theme cities along the 136km-long Kundli-Manesar-Palwal expressway. The directorate of town and country planning (DTCP) will notify land patches earmarked for these future cities as controlled areas for the specific use. These proposed theme cities include cyber city, bio-science city, medical city, fashion city, entertainment city and leisure city. Deepender Singh Hooda, the MP from Rohtak, said on Sunday that out of these 13 theme cities, three would come up in Bahadurgarh on NH-10 and along the expressway. For Gurgaon district, the state government has proposed five theme cities — fashion city, entertainment city, world trade centre, leisure city and retail merchandiser warehouse centre. Similarly, Sonepat district will have specialized activities like the Rajeev Gandhi Education City, Sonepat-Kundli multifunctional urban complex. This apart, the Haryana State Industrial Development Corporation (HSIIDC) is contemplating an industrial model township at Kharkhoda on the lines of Manesar. Likewise, a leisure and a leather city have been proposed for Mewat, Palwal district will get a dry port city. State government officials said that the development of these theme cities is a part of the plan to develop the areas along the KMP expressway as a global corridor. ‘‘A consultant engaged by the state government had proposed creation of sector-specific parks and sub-cities to ensure that economic activities are developed in a systematic manner,’’ said a senior DTCP official. He added the time-frame for developing these cities has not been fixed by the state and would largely depend on foreign investment and investment from private players in the state. ‘‘All this will happen only when the expressway becomes functional. The work has already been delayed,’’ the official said. Officials said the spatial plan of the corridor will be developed around a number of specialized economic activities and each activity is envisaged to be the focus of a selfsustaining cluster city. Sources said that the threshold population required for sustaining the physical and social infrastructure will govern the development of cluster cities.

Delhi Metro's Anand Vihar trial run




The clock has started ticking again. Delhi Metro Rail Corporation (DMRC) is going to start trial runs for its new stretch from Yamuna Bank to Anand Vihar this week. The commencement of trial runs, which marks the completion of construction, is an indication that the line will be opened to the public in two-three weeks. Even though DMRC has not fixed the opening date yet, sources maintained that December 23 was being considered, subject to all clearances coming in time. Another factor is the shortage of trains, which is leading to severe congestion on Line 3. Officials said at least seven trains were needed to start the new section. However, DMRC first wants to add trains to existing lines to reduce passenger rush and then start opening more lines. The 6.17km-long line, which is elevated along the busy Vikas Marg, is expected to ferry over one lakh commuters daily by 2012. The line is an extention of the operational Line 3 (Dwarka line), which branches out from Yamuna Bank station and crosses five stations to reach the Anand Vihar border, before continuing into Ghaziabad. The Anand Vihar line is expected to be a lifeline for residents of the area as it passes through the heavily built up Vikas Marg, with residential colonies and institutional areas. The main artery sees a traffic load of over 1.5 lakh vehicles daily and about 3.7km of the Metro line passes through these areas. For all these commuters, the new line comes as respite from traffic jams on the main road. To tackle the heavy pedestrian movement, all the elevated Metro stations will double up as foot-overbridges. Parking facilities are available at Karkardooma station and also at Anand Vihar. The Anand Vihar Metro station complex also houses a railway station and an ISBT for multi-modal integration. The daily load forecast for the Anand Vihar Metro station is almost 2.5 lakh commuters for 2011. DMRC has constructed two of the longest spans — 70m each — of Phase II over the Karkardooma flyover. The height of the platform over the station, on the third floor, is about 19m, making it the highest Delhi Metro platform once it becomes operational. The station has five floors — basement, ground, first floor, concourse and platform.

From Russia with love


Russian President Dimitri Medvedev said his conversation with Prime Minister Manmohan Singh was not merely an exchange of impressions, but a “full and substantial’’ discussion that embraced several interests. Singh said apart from issues like security and N-trade, he had a “very pleasant discussion’’ on India’s participation in Russia’s pharma sector. The continuing global slowdown and a decline in oil prices have made Russia more open to reaching out to an old friend, while the change of guard in the US has seen India reaffirm ties, with Singh describing Russia as a “global world power’’ at a joint press conference on Monday. The two nations also share concerns over the rise of China. Medvedev pointed to the shared perceptions on terrorism, calling it the greatest evil of the last and current century. He said Russia would not want nuclear weapons being “held hostage to terror’’. “Russia expresses solidarity and support for India’s demand for bringing to book the perpetrators of the Mumbai terror attacks,” Medvedev said. Though Singh did not refer to Pakistan, he echoed his host’s views on a stable Afghanistan with a stable sense of nationhood. The liberal use of phrases like “most rewarding’’, “a major step in our ties’’ and “trust and confidence’’ indicated a genuine meeting of minds as did the assertion that Indo-Russian trade would touch $20 billion by 2015. Medvedev also made it clear that the G8 statement at La Aquila on restricting enrichment and reprocessing tech to non-NPT nations did not impact its related agreements with India. Medvedev did stress that Russia was opposed to the club of Nweapon states growing larger, , which has implications on the country’s position in Iran, while emphasising that N-tech should be thoroughly accounted for and should not fall into wrong hands. The nuclear agreement with Russia was stressed by both leaders, and Department of Atomic Energy chairman Srikumar Banerjee later told mediapersons that fuel guarantees, upfront clearances and, importantly, cooperation in research were important takeaways. Defence and military agreements, supply of spare parts and active cooperation in intelligence sharing augur well for the relationship. Indian sources said the agreement covers research and development, nuclear plants, upfront consent for reprocessing and fuel supply guarantees. On fuel supply, it states that any abrogation of the bilateral agreement is without prejudice to ongoing contracts and fuel supplies. The nuclear agreement signed between India and Russia is expected to provide momentum to India’s nuclear trade. Prime Minister Manmohan Singh said there would an addition to the two reactors being developed at Koodankulam in Tamil Nadu while a site was being considered at Haripur in West Bengal. Later Banerjee said the site would most probably be offered to the Russians once land clearances were obtained from West Bengal government. The two sides signed a total of six agreements but the Russians were clearly pleased with the civil nuclear cooperation pact. The reactors, which cost about $1.5 billion each, will certainly be welcome for a Russian economy that is simply not doing too well. Banerjee also spoke of India’s plans for 10,000 MW capacity which would be a mix of reactors built by foreign suppliers and indigenous 700 MW pressurised heavy water reactors. “The current uranium reserves we have allow us to support 10,000 MW,” Banerjee said. Eight 700 MW PHW reactors were being planned at present that would account for 5,600 MW. There was some good news on the uranium supplies front as potentially minable deposits had been found in Karnataka and Andhra Pradesh. The site in Meghalaya was still affected by environmental issues that were being sorted out.. With the meeting with Medvedev having set the mood, Singh’s interaction with Putin, still very much the “real’’ power centre in Moscow, is expected to see a detailed exchange of assessments. Putin and Singh will also address a conference of CEOs to be attended by Indian biz honchos. The easing of credit is seen to address a long-pending irritant as banks have tended to rate Russia’s risk status on the higher side. Terming India a “deserving candidate”, Russia on Monday backed its claim for a permanent membership in an expanded United Nations Security Council reflecting the present-day realities. “Russia views India as one of the deserving candidates for the seat of permanent member in the expanded UNSC,” says a joint declaration signed here after summit talks between PM Manmohan Singh and Russian President Dimitri Medvedev.